Decontamination and full disassembly of each system. |
|
Outer covers, chassis and most internal surfaces are completely stripped, sand blasted, primed and painted |
|
with 3 part compound,color-matched paint. |
|
All original logos and signage are replaced in original appearance. |
|
Tubing, fittings, reagent lines, waste assembly, syringes, seals, check valves, probes and similar items are |
| |
exchanged with new components. |
|
Electrical, mechanical and pneumatic assemblies are reviewed, rebuilt or replaced. |
|
System is then completely reassembled in accordance to protocol and established specifications. |
|
Diagnostics are performed and system is tested with calibrator materials to ensure proper functionality. |
|
After calibration, systems are tested with controls for consecutive and concurrent passes on quality controls |
|
on pre-specified parameters. |
|
The system is checked for power stability, software revisions and other upgrades. |
|
System is properly drained, protected and prepared for storage. |
|
Systems are supplied with the required peripherals for proper operation along with quality control results, and |
|
warranty documentation. |
|
All systems are professionally crated with heat-treated and non-coniferous wood. |
|
General consumables for systems are not supplied standard, but may be purchased along with any system. |